Quantitative definition of projects impacted by change orders

Hanna, A S; Camlic, R; Peterson, P A and Nordheim, E V (2002) Quantitative definition of projects impacted by change orders. Journal of Construction Engineering and Management, 128(1), pp. 57-64. ISSN 0733-9364

Abstract

Change, defined as any event that results in a modification of the original scope, execution time, or cost of work, is inevitable on most construction projects due to the uniqueness of each project and the limited resources of time and money available for planning. Change may occur on a project for a number of reasons, such as design errors, design changes, additions to the scope, or unknown conditions. For each change, contractors are entitled to an equitable adjustment to the base contract price and schedule for all productivity impacts associated with the change. Changes may or may not have an impact on labor productivity. Existing literature uses subjective evaluation to determine whether the project is impacted. Projects impacted by change cause the contractor to achieve a lower productivity level than planned. The focus of this paper is to quantify whether an electrical or mechanical project is impacted by a change order. Through statistical hypothesis testing, groups of factors that correlate with whether a project is impacted by change orders were identified and used to develop a quantitative definition of impact. Logistic regression techniques were used to develop models that predict the probability of a project being impacted. The results of this research show that percent change, type of trade, estimated and actual peak manpower, processing time of change, overtime, overmanning, and percent change related to design issues are the main factors contributing to the project impact.

Item Type: Article
Uncontrolled Keywords: change orders; project management; quantitative analysis
Index terms: design change, quantitative analysis, construction project, productivity, change order, design error, logistic regression, testing, project management, labour productivity
Subjects: professional practice, contractual arrangements, data analysis and analytics, project management theory and practice, production management, contractual condition, management, statistical analysis
Topics: Design Practice, Site Management, Contract Administration, Business Strategy, Engineering Principles, Project Management, Research Practice, Procurement
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here