Constructability concepts in west port highway in Malaysia

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2002) Constructability concepts in west port highway in Malaysia. Journal of Construction Engineering and Management, 128(4), pp. 348-356. ISSN 0733-9364

Abstract

This paper presents a case study of the applications and nonapplications of constructability concepts to illustrate, in a practical way, the impact that these concepts can have on a project's success. This case study, which conveys an important message with regard to the application of constructability concepts, was purposely chosen from among prestigious projects in peninsular Malaysia. The basic message, as viewed by the interviewees, is that applying these constructability concepts will enhance a project's constructability, consequently optimizing the schedule, cost, and quality of the project for the benefit of all the parties involved. The interviewees for the case study agreed that the applied constructability concepts were derived from their own experience and not based on any existing formal program. The absence of a systematic technique for transferring construction experience and knowledge to all the participants in all phases of a construction project is the reason behind the lack of constructability in our construction industry today.

Item Type: Article
Uncontrolled Keywords: constructability; Malaysia; project planning
Index terms: construction project, program, project planning, Malaysia, case study, constructability, construction industry
Subjects: production management, Geography, construction integration, software systems, industry analysis, control systems, data collection methods
Topics: Design Practice, Digital Applications, Research Practice, Geographical Context, Project Management
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here