Using benchmarks and metrics to evaluate project delivery of environmental restoration programs

Brunso, T P and Siddiqi, K M (2003) Using benchmarks and metrics to evaluate project delivery of environmental restoration programs. Journal of Construction Engineering and Management, 129(2), pp. 119-130. ISSN 0733-9364

Abstract

The United States is in the middle of a large environmental restoration effort that is hampered by a lack of knowledge on how to measure the performance of the project delivery process. This study evaluates one environmental restoration program's ability to deliver projects: the Environmental Management Program (EMP), a federally sponsored program managed by the U.S. Army Corps of Engineers. Project performance metrics are compiled and used to measure two types of program improvements made in project delivery: trend improvements over time, and the ability to reach established benchmarks. The benchmarks come from both agency guidance and construction industry benchmarks. The metrics measure the program's ability to accurately estimate the required resources (time and money) to accomplish the project, estimate the cost to operate and maintain the project, and meet the customers' design requirements. To build the metrics, estimates from the project planning documents are compared against the actual results. Currently, the Corps of Engineers has established some benchmarks and does evaluate projects for design success, but the benchmarks do not include all aspects of project delivery and are not universally applied. Analysis of the metrics shows that the Corps has made improvements in the delivery of projects, but some major components of the process should be improved. Establishing benchmarks would provide the Corps with information to improve the project delivery of the EMP and other environmental restoration programs across the country. This study provides an example of applying business principles to a governmental program.

Item Type: Article
Uncontrolled Keywords: benchmarks; delivery; evaluation
Index terms: restoration, agency, project planning, program, documents, United States, estimate, construction industry, environmental management, project delivery, project performance, engineer
Subjects: project delivery, financial and cost management, control systems, profession, industry analysis, sociology, project management theory and practice, professional development, Geography, software systems, renovation and retrofit, sustainability assessment
Topics: Digital Applications, Procurement, Sustainability, Roles and Professions, Research Practice, Geographical Context, Project Management, Engineering Principles, Information Management, Cost Management
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here