Engineering information classification system

Chang, A S T and Tsai, Y W (2003) Engineering information classification system. Journal of Construction Engineering and Management, 129(4), pp. 454-460. ISSN 0733-9364

Abstract

A good information classification and coding system is of great advantage to management. However, until now there has been no such a system for engineering management. MasterFormat is widely accepted as a construction information system but is not applicable to engineering work. This paper presents an engineering information classification system for engineering management that has a faceted and hierarchical structure that can flexibly classify information from facility to resource levels, such as construction information classification systems. The six digit coding system for products and functional tasks assists in project cost data collection and schedule planning. A design project was used as an example; the application can be broadened to incorporate the profit center practice and align a consulting firm's business strategy.

Item Type: Article
Uncontrolled Keywords: classification; information management; management engineering
Index terms: information system, schedule planning, business strategy, profit, engineering management, project cost
Subjects: control systems, economics, economic analysis, operations research, business, information systems
Topics: Digital Applications, Cost Management, Project Management, Business Strategy, Time Control
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here