Project delivery systems and project change: Quantitative analysis

Ibbs, C W; Kwak, Y H; Ng, T and Murat Odabasi, A (2003) Project delivery systems and project change: Quantitative analysis. Journal of Construction Engineering and Management, 129(4), pp. 382-387. ISSN 0733-9364

Abstract

Design/build has become one of the favored project delivery methods in the engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. A comprehensive analysis of 67 global projects from the Construction Industry Institute's database shows that design/build projects may not provide all the benefits to project performance. The study found timesaving was a definitive advantage of design/build project delivery, but, the positive effects of cost and productivity changes were not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

Item Type: Article
Uncontrolled Keywords: delivery; design/build; project management
Index terms: productivity, database, Construction Industry Institute, construction industry, project delivery, project management, project performance, strategy, quantitative analysis
Subjects: project management theory and practice, management, industry analysis, data management, research organizations, project delivery, data analysis and analytics
Topics: Procurement, Business Strategy, Project Management, Research Practice, Digital Applications
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here