Predictive tool for estimating accident risk

Lee, S and Halpin, D W (2003) Predictive tool for estimating accident risk. Journal of Construction Engineering and Management, 129(4), pp. 431-436. ISSN 0733-9364

Abstract

This paper presents a predictive tool that uses safety factors to estimate accident risk for processes commonly employed on construction sites. The tool is demonstrated in the context of the utility-trenching process. Based on expert surveys, preplanning, supervision, and training are identified as critical safety factors needed to predict accident risk when evaluating safety performance related to trenching operations. Preplanning has a greater impact on excavation tasks than supervision and training, while conversely, supervision and training are more important during the pipe installation phase of trenching operations.

Item Type: Article
Uncontrolled Keywords: accident prediction; construction site accidents; safety factors; trenching
Index terms: estimating, safety performance, excavation, supervision, safety factor, construction site, construction site accident, survey, estimate
Subjects: data collection methods, control systems, work location, construction operations, occupational health and safety management, financial and cost management, financial risk, health risk and incident analysis
Topics: Site Management, Health and Safety, Research Practice, Cost Management, Project Management
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here