Owner-contractor work structures: Process approach

Anderson, S D; Patil, S S; Gibson Jr, G E and Sullivan, G R (2004) Owner-contractor work structures: Process approach. Journal of Construction Engineering and Management, 130(5), pp. 680-690. ISSN 0733-9364

Abstract

This paper describes a process to assist project managers, within owner companies, define work relationships between owners and their contractors for capital project development, and execution. The owner-contractor work structure process was developed by the Construction Industry Institute as a step-by-step process for making rational decisions about the most appropriate owner-contractor work structure for capital projects. A work structure is described by a set of project competencies and the extent of involvement of the owner and contractor in performing, leading, and/or providing input with respect to those project competencies. The process is described using a formal process modeling technique. Three case studies, conducted to validate the owner-contractor work structure process, are discussed. The results from these case studies suggested some basic changes to the process that would enhance its use in practice. A modified owner-contractor work structure process is then presented.

Item Type: Article
Uncontrolled Keywords: contractors; owners; project management
Index terms: process modelling, owner, Construction Industry Institute, project manager, case study, project management, capital project
Subjects: strategic project management, design analysis, profession, research organizations, data collection methods, sociology, project management theory and practice
Topics: Design Practice, Stakeholder Management, Roles and Professions, Project Management, Research Practice
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here