Where do we stand with fuzzy project scheduling?

Bonnal, P; Gourc, D and Lacoste, G (2004) Where do we stand with fuzzy project scheduling? Journal of Construction Engineering and Management, 130(1), pp. 114-123. ISSN 0733-9364

Abstract

Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project-scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.

Item Type: Article
Uncontrolled Keywords: fuzzy sets; project management; scheduling
Index terms: practitioner, project scheduling, project management, scheduler, fuzzy set, decision-making, scheduling
Subjects: project management theory and practice, operations research, decision-making and optimization, project controls, decision analysis, practitioner
Topics: Time Control, Project Management, Roles and Professions, Research Practice, Risk Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here