Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364
Abstract
Four-dimensional (4D) models link three-dimensional geometrical models with construction schedule data. The visual link between the schedule and construction site conditions is capable of facilitating decision making during both the planning and construction stages. The emphases of these 4D developments have often been placed at the level of construction components. Practical features assisting site management are at times lacking in the following areas: (1) generation of site usage layouts; (2) estimation of quantities of construction materials; and (3) cost evaluation. In order to pinpoint these deficiencies, the objective of this work is to enable visual study of the effects of job progress on the logistics and resource schedules. This paper presents a 4D visualization model that is intended both to help construction managers plan day-to-day activities more efficiently in a broader and more practical site management context and to thereby add to our knowledge and understanding of the relevance of modern computer graphics to the responsibilities of the construction site manager. A brief site trial of the software is described at the conclusion of the paper.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | computer aided scheduling; construction planning; construction sites; graphic methods; three-dimensional models |
| Index terms: | construction site, scheduling, manager, visualization, construction manager, decision-making, estimation, 4D visualization, construction scheduling, construction planning, construction stages, computer graphic, site management, construction material |
| Subjects: | project controls, decision analysis, design practice, work location, building materials, operations research, visualization, construction operations, financial and cost management, project delivery, construction planning, profession, practitioner, computer hardware |
| Topics: | Design Practice, Digital Applications, Time Control, Site Management, Cost Management, Project Management, Engineering Principles, Risk Management, Roles and Professions |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here