Finance-based scheduling of construction projects using integer programming

Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364

Abstract

Construction scheduling is the process of devising schemes for sequencing activities. A realistic schedule fulfills the real concerns of users, thus minimizing the chances of schedule failure. The minimization of total project duration has been the concept underlying critical-path method/program evaluation and review technique (CPM/PERT) schedules. Subsequently, techniques including resource management and time-cost trade-off analysis were developed to customize CPM/PERT schedules in order to fulfill users' concerns regarding project resources, cost, and time. However, financing construction activities throughout the course of the project is another crucial concern that must be properly treated otherwise, nonrealistic schedules are to be anticipated. Unless contractors manage to procure adequate cash to keep construction work running according to schedule, the pace of work will definitely be relaxed. Therefore, always keeping scheduled activities in balance with available cash is a potential contribution to producing realistic schedules. This paper introduces an integer-programming finance-based scheduling method to produce financially feasible schedules that balance the financing requirements of activities at any period with the cash available during that same period. The proposed method offers twofold benefits of minimizing total project duration and fulfilling finance availability constraints.

Item Type: Article
Uncontrolled Keywords: computer programming; scheduling
Index terms: construction work, duration, resource management, integer programming, time-cost trade-off, construction scheduling, construction activity, programme evaluation and review technique, construction project, programming, financing, scheduling, minimization
Subjects: control systems, programming, economic analysis, construction operations, operations management, operations research, production management, algorithms, quantity surveying, project controls
Topics: Business Strategy, Project Management, Risk Management, Digital Applications, Site Management, Time Control
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here