Distributed scheduling model for infrastructure networks

Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364

Abstract

This paper presents an innovative model for scheduling, resource planning, and cost optimization of large construction and/or maintenance programs that involve multiple distributed sites. The proposed distributed scheduling model (DSM) employs an information system to store data related to various work sites, activities' optional construction methods, and available resources. The DSM also incorporates a scheduling algorithm that is resource focused, and maintains crew work continuity under any sequence of distributed sites. To minimize cost and meet project time and resource constraints, the DSM uses genetic algorithms to determine the optimum set of construction methods and the optimum routing order among sites. Details of the DSM formulation are presented in this paper and the benefits to municipalities and contractors are outlined.

Item Type: Article
Uncontrolled Keywords: algorithms; computer applications; cost control; infrastructure; optimization; scheduling
Index terms: construction method, genetic algorithm, scheduling, cost optimization, municipality, information system, resource constraint, program, cost control, computer application, resource planning
Subjects: financial and cost management, resource management, operations management, operations research, algorithms, software systems, economics, information systems, administrative law, building construction
Topics: Project Management, Cost Management, Legal Issues, Digital Applications, Time Control, Site Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here