Impact of labor factors on workflow

Lee, H S; Yu, J H and Kim, S K (2004) Impact of labor factors on workflow. Journal of Construction Engineering and Management, 130(6), pp. 918-923. ISSN 0733-9364

Abstract

This paper describes a relationship between workflow and labor factors such as variations in labor resource stability and worker loyalty. In order to measure such factors, relevant indicators are identified and validated through interviews with experts. In addition, a causal model is presented to explain the relationship among labor factors and workflow. The theoretical basis for this model rests on the assumption that worker loyalty and the rate of worker change are consistent with variations in the planned workflow. A case study of a building construction project was performed to implement the causal model. A statistical method, called path analysis, was adopted to verify the causal model. The result of the analysis is in good agreement with the concepts used in the assumption, and thus, the conclusion can be made that the suggested labor factors are substantial in the management of workflow.

Item Type: Article
Uncontrolled Keywords: construction management; labor; personnel management; regression analysis; variability
Index terms: workflow, variation, stability, building construction, interview, personnel, regression analysis, path analysis, variability, labour resource, statistical method, case study
Subjects: data collection methods, statistical analysis, business economics, building construction, contractual condition, management, structural engineering
Topics: Contract Administration, Human Resources, Construction Technology, Business Strategy, Engineering Principles, Research Practice
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here