Flexible model for time/cost tradeoff problem

Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364

Abstract

This paper presents a flexible mixed integer-programming model for the solution of the time/cost tradeoff problem encountered in project management. Whereas it is commonly assumed that the time/cost function is linear, the model presented in this paper makes minimal assumptions and accommodates any type of cost function that is linear, piecewise linear or discrete. The model can be used for answering various "what if" questions that may be very helpful to a project manager in making rational decisions. The basic model minimizes the total cost which is the sum of direct and indirect costs, subject to a project deadline constraint. A simple modification in the model changes the focus from minimizing total cost to minimizing project completion time subject to a resource constraint. The models of this paper can be set up and run very easily on commercially available optimization packages with an integer-programming module. These models provide a viable alternative to more specialized algorithms developed for the time/cost tradeoff problem simply because a typical project manager may not have the necessary skills or resources to implement specialized algorithms.

Item Type: Article
Uncontrolled Keywords: computer programming; costs; critical path method; models; project management; time factors
Index terms: tradeoff, mixed integer, critical path method, programming, resource constraint, completion time, indirect cost, package, project manager, project management, module
Subjects: operations management, operations research, contractual arrangements, mathematical modelling, profession, programming, decision analysis, project controls, cost management, architectural elements, project management theory and practice
Topics: Risk Management, Roles and Professions, Procurement, Research Practice, Project Management, Time Control, Design Practice, Digital Applications
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here