Symbiotic crew relationships and labor flow

Thomas, H R; Horman, M J and De Souza, U E L (2004) Symbiotic crew relationships and labor flow. Journal of Construction Engineering and Management, 130(6), pp. 908-917. ISSN 0733-9364

Abstract

This paper introduces a concept heretofore unrecognized in multiple crew relationships: symbiotic crew relationships. A symbiotic relationship occurs when the work pace of one crew depends on the pace of a preceding crew. Data from steel reinforcement activities from six commercial and residential projects in Brazil are used to demonstrate the negative effects of symbiotic relationships. The steel reinforcement on the case study projects was cut and bent on site. In this context, the pace of the installation crew's work (and hence performance) was dictated by the pace of the cutting and bending crew. The performance of crews with symbiotic relationships is shown to be consistently worse than when symbiotic relationships are not present. Symbiotic relationships are also tied to time buffers. There is better performance as the time buffer between crews approaches 5 days.

Item Type: Article
Uncontrolled Keywords: construction management; labor; personnel management
Index terms: case study, residential project, personnel, reinforcement, Brazil, time buffer
Subjects: operations research, management, Geography, building materials, data collection methods, economic development
Topics: Human Resources, Urban Studies, Construction Materials, Geographical Context, Research Practice, Time Control
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here