Abstract

A critical contributor to the success of a public/private partnered (PPP) infrastructure project is the selection of the right private-sector partner, the concessionaire, who would provide the best overall deal throughout the build-operate-transfer (BOT) development process. This paper proposes a core concessionaire selection protocol that incorporates public procurement principles, best-value selection approach, competitive selection process, and multicriteria tender evaluation. Key pointers for an improved concessionaire selection protocol are discussed and analyzed by drawing experience and learning lessons from worldwide PPP practices. These include improved project brief and tender documents, formulation of a best-value selection methodology, determination of suitable criteria and methods for prequalification and tender evaluation, capital structure (equity-to-debt ratio), financial models, and potential improvements in different stages of the concessionaire selection process. Relevant results of a questionnaire survey of international PPP expert opinions on an enhanced concessionaire selection protocol are also presented.

Item Type: Article
Uncontrolled Keywords: financial factors; infrastructure; partnerships; private sectors; project management
Index terms: partnership, private sector, project management, capital structure, infrastructure project, financial factor, build-operate-transfer, survey, drawing, concessionaire, questionnaire, tender document, tender evaluation, methodology
Subjects: economic analysis, contractual arrangements, technical documentation, contract type, data collection methods, infrastructure and transport systems, industry analysis, partnership management, project management theory and practice, research methods, tendering
Topics: Design Practice, Business Strategy, Research Practice, Project Management, Engineering Principles, Stakeholder Management, Procurement
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here