Geographic information system-based visual simulation methodology and its application in concrete dam construction processes

Zhong, D; Li, J; Zhu, H and Song, L (2004) Geographic information system-based visual simulation methodology and its application in concrete dam construction processes. Journal of Construction Engineering and Management, 130(5), pp. 742-750. ISSN 0733-9364

Abstract

System simulation has proved to be an effective tool for planning and improving the performance of a construction process in many successful case studies. However, with the aid of a three-dimensional (3D) visualization system, simulation technology will be engaged to its farthest-reaching potential. This paper presents a geographic information system (GIS)-based visual simulation method, in which system simulation techniques are integrated with visualization techniques. The GIS-based visual simulation system (GVSS) was developed by the authors. The GVSS is a simulation tool offering powerful planning, visualizing, and querying capabilities that facilitate the detection of logic errors in simulation models. The software also helps to understand the comprehensively complex modeled construction process, and is capable of organizing vast amounts of spatial and nonspatial data involved in simulation. A hydroelectric project, which will take place on the Yellow River in the northwest of China, is used as an example. An optimum equipment set scheme is determined by simulating a variety of scenarios taking place under different construction conditions. Likewise, other parameters, such as the construction sequence of dam blocks, the monthly intensity of the concrete process, and the construction appearance at the middle and end of each year, are obtained. Meanwhile, the complex processes of dam construction are demonstrated dynamically using 3D animation, which provides a powerful tool for quickly and comprehensively understanding the whole construction process. The GVSS has proven to be a helpful and useful tool for the design and management of concrete dams.

Item Type: Article
Uncontrolled Keywords: dam construction; dams; concrete; geographic information systems; imaging techniques; optimization; simulation; three-dimensional models
Index terms: simulation tool, visualization, China, dam construction, construction process, methodology, geographic information system, case study
Subjects: analytical methods, data collection methods, building construction, geographical techniques and analysis, infrastructure engineering, Geography, research methods, design practice
Topics: Engineering Principles, Geographical Context, Research Practice, Design Practice, Site Management
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here