Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364
Abstract
Cash flow forecasting methods have evolved to allow detailed predictions for individual projects. These methods, principally the cost-schedule integration (CSI) technique, make extensive use of project estimate and schedule data. An implicit assumption of these methods has been that accuracy is largely a function of the quality of data available to the model. To the writers' knowledge, there has been no assessment of the ability of project specific cash-flow models to accurately predict cash flows given accurate input data. This paper makes two contributions. First, two complementary methods are presented - pattern matching logic and factorial analysis - that provide an ability to assess the accuracy of cash flow models. Second, through demonstration of these methods using data from two projects, a critique is made of the ability of existing CSI models to accurately predict cash flows. The paper concludes by recommending extensions of CSI models to include more detailed payment conditions, including differential payment lags, components for materials and labor, and payment frequency. A further conclusion is the call for more research to better understand the balance between managers' need for information and the ability of predictive models to provide that information.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | computer aided scheduling; cost analysis; cost control; critical path method; forecasting; project management |
| Index terms: | cost analysis, cost control, accuracy, project management, cash flow, integration, cash flow forecasting, critical path method, manager, forecasting, critique, scheduling, estimate |
| Subjects: | professional development, practitioner, operations research, evaluation and assessment methods, financial management, financial and cost management, organizational analysis, prediction and forecasting, project management theory and practice |
| Topics: | Information Management, Cost Management, Project Management, Time Control, Research Practice, Organizational Design, Roles and Professions |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here