Cost impacts, scheduling impacts, and the claims process during construction

Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364

Abstract

Construction mismanagement results in multiple problems that can cascade throughout the work force chain, affecting the schedule and leading to damages to multiple parties. Although the problem may start with a single subcontractor, it can result in all contractors feeling some impact to their work. In this paper, a case study is presented of a project with seven different mismanagement scenarios. A description of each scenario is provided as well as a quantification of the damages that result from the problem. A construction claims section is also included that addresses many of the issues that could result from a claim for each of the seven scenarios. A discussion is presented outlining possible preventative steps to minimize the damages from the problems presented.

Item Type: Article
Uncontrolled Keywords: claims; cost control; scheduling
Index terms: subcontractor, construction claim, cost control, damages, scheduling, case study, quantification
Subjects: operations research, financial and cost management, data collection methods, practitioner, dispute resolution, payment, measurement and scaling
Topics: Legal Issues, Contract Administration, Time Control, Research Practice, Cost Management, Roles and Professions
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here