Cost of abrasive cutting in decommissioning operations in the gulf of Mexico

Kaiser, M J; Pulsipher, A G and Byrd, R C (2005) Cost of abrasive cutting in decommissioning operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 137-148. ISSN 0733-9364

Abstract

Mechanisms that inject cutting materials into a water jet and abrasively wear away steel/concrete are called abrasive cutters. The purpose of this paper is to model the cost of abrasive cutting operations associated with decommissioning offshore structures in the Gulf of Mexico. The elements of a standard abrasive cutting contract are presented and the total cost of a job is derived based on the parameters of the contract. The total cost to perform a severance operation is aggregated according to job type and normalized according to the number, size, and length of cut performed. Descriptive statistics are provided based on data collected over a three-year period from 2000-2002, and relations are derived that estimate the time and cost of a cutting operation based on various descriptor variables. A major conclusion of the analysis is that abrasive cutting is a structure-independent operation, or in other words, the total cost of performing the service does not depend on the characteristics of the structure and can only be predicted after the job is finished and the on-site time of the cutting crew is known. This is in sharp contrast to explosive cutting, where structural characteristics are very good indicators of job cost.

Item Type: Article
Uncontrolled Keywords: abrasives; coastal management; decommissioning; gulf of Mexico; offshore platforms; water jets
Index terms: Mexico, decommissioning, estimate, statistics, platform
Subjects: digital design, Geography, renovation and retrofit, mathematical modelling, financial and cost management
Topics: Digital Applications, Cost Management, Engineering Principles, Research Practice, Geographical Context
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here