Kim, Y; Kim, K and Shin, D (2005) Delay analysis method using delay section. Journal of Construction Engineering and Management, 131(11), pp. 1155-1164. ISSN 0733-9364
Abstract
The most common cause of construction claims is delay. Moreover, delay claims are often extremely complex and difficult to resolve. For this reason, the construction industry requires an effective and reliable method for analyzing the causes and effects of construction delay. Presently, the methods of analysis in common use do not adequately account for several commonly encountered situations. As a result, project time extensions are often considered without rigorous analysis. Therefore the objective of this study is to propose and describe an effective and logical method for evaluating construction delays that adequately accounts for commonly encountered situations. To achieve this objective, the writers propose a new methodology called "delay analysis method using delay section" (DAMUDS) as a means of overcoming two limitations of existing methods: (1) inadequate accounting of concurrent delay and (2) inadequate accounting of time-shortened activities. The DAMUDS method builds upon the widely used method of contemporaneous period analysis. The writers' points are illustrated through the use of an example case.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | claims; delay time |
| Index terms: | delay analysis, methodology, construction delay, accounting, construction claim, construction industry |
| Subjects: | economic analysis, research methods, project controls, payment, industry analysis |
| Topics: | Business Strategy, Research Practice, Contract Administration, Time Control |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here