Development and on-site evaluation of an automated materials management and control model

Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364

Abstract

Materials resources constitute a large portion of a project's total cost and this makes them an important and attractive subject to control. Proper control and management of materials can meaningfully increase productivity by 6%, or more. A model based on automatic, or semiautomatic, data collection for materials management and control was developed. Based on project plans, the model initiates and manages the ordering of materials automatically and monitors both the actual flow of materials and the current stock at the construction site. The model permits real-time control, enabling corrective actions to be taken. In this manner, costs and unnecessary handling of materials are reduced. In addition, up-to-date information regarding materials flow is available and different statistical analyses are enabled: materials acquired from a specific supplier; materials used for a specific activity; and materials used during a specific month, etc. The information generated by the model enables the updating of a historical database to be used for planning of future projects.

Item Type: Article
Uncontrolled Keywords: automation; control methods; data collection; feedback control; materials; monitoring; site evaluation
Index terms: control method, database, time control, construction site, materials flow, monitoring, productivity, statistical analysis, automation, materials management
Subjects: work location, project controls, monitoring and control, data science, automation and robotics, material science and engineering, operations management, management, data management, control systems
Topics: Site Management, Construction Materials, Research Practice, Digital Applications, Business Strategy, Time Control
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here