Considering prework on industrial projects

Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364

Abstract

Prefabrication, preassembly, modularization, and off-site fabrication, collectively termed as prework have become more viable with recent advances in design and information technologies. These construction methods offer a substantial opportunity to improve project performance when circumstances merit. Successful implementation of these methods on a particular project requires systematic analysis and early decision making based on specific factors of the project. This paper identifies those factors influencing decisions on the use of prework, and current industry practices for evaluating the applicability of prework on industrial projects. It then presents a decision framework to assist industry practitioners with evaluating the applicability of prework on their project, and describes a computerized tool to aid project teams in the decision-making process. The developed framework and tool are useful and effective in the decision-making process, and easy to use, as validated by practitioners in the industry.

Item Type: Article
Uncontrolled Keywords: construction management; construction methods; decision making; decision support systems; modular structures; prefabrication
Index terms: project performance, practitioner, decision framework, decision-making process, decision support, modularization, construction method, information technology, implementation, project team, fabrication, prefabrication, decision-making
Subjects: practitioner, computing systems, decision analysis, manufacturing engineering, building construction, project delivery, contractual arrangements, project management theory and practice
Topics: Project Management, Site Management, Roles and Professions, Construction Technology, Digital Applications, Procurement, Engineering Principles, Risk Management
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here