Construction delivery systems: A comparative analysis of their performance within school districts

Col Debella, D and Ries, R (2006) Construction delivery systems: A comparative analysis of their performance within school districts. Journal of Construction Engineering and Management, 132(11), pp. 1131-1138. ISSN 0733-9364

Abstract

Multiple prime is one type of construction delivery system and it is the subject of many discussions in the industry. Many general contractors, architects, and owners believe that this system inherently has coordination problems. On the other hand, specialty contractors believe that this system has several advantages because of the exclusion of the intermediate parties and the direct relationship of these contractors to the owner. The goal of this study is to objectively analyze the performance of construction delivery systems within public school districts. The school districts in the states of Pennsylvania, Ohio, New Jersey, Massachusetts, and Virginia form the population of this study. Quantitative and qualitative variables are used for comparison. ANOVA and two-sample t tests are used as statistical tools for the quantitative, and the chi-square test is used for the qualitative analysis. Two groups of projects are examined. Set one includes all valid responses to a survey sent to school district superintendents. The second set is limited to the analysis of projects whose total cost is greater than $10× 106. Descriptive statistics on the incidence of litigation in these projects is also presented in the results. The conclusions from this study can guide owners, especially public entities with limited flexibility, in the selection of the delivery system appropriate for their project. It can guide contractors in identifying opportunities for improving services to their clients. This study has provided quantitative and qualitative measures of alternative project delivery systems in public projects that could lead to further research as well as the development of delivery systems that would satisfy the multiple stakeholders in construction projects.

Item Type: Article
Uncontrolled Keywords: delivery; schools; statistics
Index terms: general contractor, survey, comparative analysis, New Jersey, population, construction project, public project, qualitative analysis, owner, litigation, specialty contractor, statistics, school district, coordination, public school, project delivery, architect
Subjects: practitioner, dispute resolution, research design and methodology, mathematical modelling, profession, data collection methods, project delivery, educational management, data analysis and analytics, professional practice, infrastructure engineering, Geography, production management, management, sociology, educational institutions, demography
Topics: Legal Issues, Urban Studies, Organizational Design, Education, Geographical Context, Project Management, Research Practice, Engineering Principles, Stakeholder Management, Roles and Professions, Procurement
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here