Only dynamics can absorb dynamics

Telem, D; Laufer, A and Shapira, A (2006) Only dynamics can absorb dynamics. Journal of Construction Engineering and Management, 132(11), pp. 1167-1177. ISSN 0733-9364

Abstract

A study conducted in Israel, among ten excellent on-site construction project managers (PMs), examined the ways in which they cope with the dynamic project environment of the modern construction site (complex, uncertain, and fast). Empirical data gathered by means of structured observations led to the development of the Star Model, which offers a multidimensional description of the dynamic patterns of the managers' activities, namely, their managerial dynamics. In addition, characterization of the level of environment dynamics with which managers were required to cope in their work, led to the identification of a tentative relationship between contextual conditions that characterize the project environment and the level of managerial dynamics practiced by the managers. This tentative relation, which basically suggests that managers should adapt their level of managerial dynamics to the level of dynamics they find on-site, apparently holds one of the keys to the managers' excellent job performance.

Item Type: Article
Uncontrolled Keywords: construction management; construction sites; dynamic characteristics; environmental issues; project management
Index terms: construction site, project management, manager, construction project, Israel, environmental issue, dynamics
Subjects: production management, Geography, practitioner, environmental issues, systems engineering, project management theory and practice, work location
Topics: Engineering Principles, Site Management, Sustainability, Roles and Professions, Project Management, Geographical Context
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here