Intelligent painting process planner for robotic bridge painting

Bai, Y (2007) Intelligent painting process planner for robotic bridge painting. Journal of Construction Engineering and Management, 133(4), pp. 335-342. ISSN 0733-9364

Abstract

Due to increased government regulations on environment, health, and safety, the cost of on-site bridge painting has quadrupled over the past several years. The construction industry faces a great challenge in how to control the increased costs of bridge painting and meet the regulations at the same time. A possible solution to address this challenge is to develop a robotic bridge painting system. The development of the robotic system can be justified by the potential improvements in safety and productivity. This paper presents the development and testing of an Intelligent Painting Process Planner. The Planner, built based on bridge feature scheme, is the key component for the robotic bridge painting system that integrates the painting process planning, robot path planning, cost optimization, and quality control functions. During the development process, lab experiments were conducted to determine the values of painting process planning parameters and coating thickness distribution functions. Field tests demonstrated that the prototype robotic bridge painting system achieved the specified painting quality using the parameter values provided by the Planner. Areas that need to be improved in the future were also identified.

Item Type: Article
Uncontrolled Keywords: bridges; painting; robotics
Index terms: coating, experiment, face, prototype, thickness, cost optimization, field test, regulation, distribution function, productivity, government regulation, testing, construction industry, quality control, robotics, planner
Subjects: political science, industry analysis, economics, management, probability and distributions, automation and robotics, health safety and environment, building materials, modelling and simulation, psychology, project delivery, professional practice, data collection methods, profession, materials science
Topics: Quality Management, Digital Applications, Organizational Design, Construction Materials, Engineering Principles, Research Practice, Health and Safety, Business Strategy, Cost Management, Governance, Roles and Professions
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here