Relating cost growth from the initial estimate to design fee for transportation projects

Gransberg, D D; Lopez Del Puerto, C and Humphrey, D (2007) Relating cost growth from the initial estimate to design fee for transportation projects. Journal of Construction Engineering and Management, 133(6), pp. 404-408. ISSN 0733-9364

Abstract

Intuitively, there should be a relationship between the size of the design fee for a transportation project and the quality of the resulting design. This study sought that relationship by looking at the fee expressed as a percentage of the construction cost and the final construction cost growth from the engineer's initial estimate of the construction cost at the time the design contract was awarded. The research team analyzed 31 projects from the Oklahoma Turnpike Authority with a total construction value of $90 million. The projects were divided into road and bridge projects. Based on the results of the analysis, it seems that as the design fee decreases, the absolute percentage of construction cost growth from the engineer's early estimate increases. The relationship is strongest for bridge projects, which tend to be more technically complex to design than roadway projects. This confirms for U.S. projects the result of an earlier study in Saudi Arabia. This paper concludes that the design fee should be viewed as an investment at a point in time where the ability to impact the project is the highest and can accrue the benefit of reduced cost growth.

Item Type: Article
Uncontrolled Keywords: bridge; bridges; highways; construction costs; fees; highways
Index terms: bridge project, estimate, construction cost, engineer, Saudi Arabia, transportation project
Subjects: infrastructure and transport systems, Geography, financial and cost management, profession
Topics: Roles and Professions, Cost Management, Geographical Context, Engineering Principles
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here