Decision analysis applied to tunnel exploration planning. I: Principles and case study

Karam, K S; Karam, J S and Einstein, H H (2007) Decision analysis applied to tunnel exploration planning. I: Principles and case study. Journal of Construction Engineering and Management, 133(5), pp. 344-353. ISSN 0733-9364

Abstract

Exploration planning is a process of decision making under uncertainty. This paper, Part I of two dealing with the exploration problem, briefly reviews the decision analytical procedure for tunnel exploration, and provides practical techniques to do so. Specifically, this paper presents an approach by which the effect of additional exploration can be assessed before actually committing to exploration, through a process of so-called virtual exploration. This is practically done with an easy-to-use software package developed in Visual Basic for Applications in Microsoft Excel, called the Decision Aids for Tunnel Exploration. Part II will describe the uncertainties that enter into the tunnel exploration decision procedure, and will provide practical techniques to asses the effects of these uncertainties on the exploration decision making.

Item Type: Article
Uncontrolled Keywords: case reports; decision making; tunnels; uncertainty principles
Index terms: tunnel, software package, exploration, decision-making, case study, decision analysis
Subjects: environmental resource management, data collection methods, infrastructure and transport systems, decision analysis, software systems
Topics: Sustainability, Risk Management, Engineering Principles, Research Practice
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here