Gates' bidding model

Skitmore, R M; Pettitt, A N and McVinish, R (2007) Gates' bidding model. Journal of Construction Engineering and Management, 133(11), pp. 855-863. ISSN 0733-9364

Abstract

In evaluating closed-bid competitive procurement auctions, the most crucial issue is to determine the probability of placing a winning bid for a given markup level. There has long been disagreement on how this should be done due to the absence of a mathematical derivation of one of the main evaluation techniques-Gates' method. Gates' method is shown in this paper to be valid if, and only if, bids can be described using the proportional hazards family of statistical distributions. When markup values are included in Gates' method, it is seen that the underlying statistical distribution required for the method to work is closely related to the Weibull distribution. Likelihood based methods are suggested for parameter estimation and an illustrative example is provided by analysis of Shaffer and Micheau's 1971 construction contract bidding data.

Item Type: Article
Uncontrolled Keywords: bids; contracts; estimation; probabilistic models; probability distribution; procurement; statistical models
Index terms: statistical model, placing, construction contract, probability distribution, estimation, parameter-estimation, bidding, evaluation technique
Subjects: concrete and cementitious materials, statistical analysis, contract type, evaluation and assessment methods, financial and cost management, data science, bidding
Topics: Cost Management, Research Practice, Construction Materials, Procurement
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here