Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme

Subprasom, K and Chen, A (2007) Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme. Journal of Construction Engineering and Management, 133(1), pp. 64-71. ISSN 0733-9364

Abstract

The build-operate-transfer (BOT) scheme is being used increasingly by governments in their drive to privatize major public transportation projects. In a BOT scheme, the main objective for the private investors in determining the viability of a BOT project is profit, whereas the main objective for the government is whether the construction of the BOT project will give a positive social welfare to the society. These two objectives are often seen to conflict with each other. In this paper, modeling and analysis of highway pricing and capacity choice of a BOT scheme are provided to illustrate the tradeoff between the two objectives. Regulation is normally imposed by the government to ensure that the BOT project satisfies certain requirements. Five cases of the BOT network design problem are analyzed: (1) BOT without regulation; (2) BOT with positive performance measures; (3) BOT with a maximum toll charge level; (4) BOT with a minimum roadway capacity; and (5) BOT with a maximum toll charge and a minimum roadway capacity. Numerical results using a case study of the intercity expressway in the Pearl River Delta Region in China are provided to examine the various effects of regulation on a BOT project.

Item Type: Article
Uncontrolled Keywords: build/operate/transfer; China; highways; pricing; regulations; transportation networks
Index terms: investor, pricing, case study, modelling, build-operate-transfer, performance measure, toll, tradeoff, profit, society, China, public transportation, regulation
Subjects: analytical methods, economic analysis, contractual arrangements, data collection methods, sociology, decision analysis, transportation engineering, political science, communities and social development, infrastructure and transport systems, performance measurement, Geography
Topics: Engineering Principles, Geographical Context, Research Practice, Business Strategy, Governance, Procurement, Stakeholder Management, Risk Management, Quality Management, Urban Studies
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here