Contractor prebid planning principles

Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364

Abstract

Planning is an essential function of project management. Yet, many small- and medium-sized contractors do a relatively poor job of operational planning. Better prebid plans will reduce costs, shorten schedules, and improve labor productivity. Unfortunately, the published literature offers little guidance for smaller contractors on what constitutes effective planning. Most papers describe planning as a macrolevel process for owners. Most emphasize scope definition for industrial projects. This paper describes a microlevel planning process for contractors. It consists of eight steps which are: (1) assess contract risks; (2) develop a preliminary execution plan; (3) develop site layout plans; (4) identify the sequences that are essential-to-success; (5) develop detailed operational plans; (6) develop proactive strategies to assure construction input into design; (7) revise the preliminary plan; and (8) communicate and enforce the plan. The entire process is illustrated with a case study project and is fully illustrated with figures which show how to integrate the work of multiple contractors, keep key resources (crews or equipment) fully engaged with no downtime, provide time buffers so the work of follow on crews can be efficiently done, expedite the schedule using multiple work stations and concurrent work, ways to communicate the work plan to the superintendent and foremen, and how to assess the feasibility of various work methods. The steps are easy to understand and implement. They will yield immediate positive results.

Item Type: Article
Uncontrolled Keywords: construction costs; contractors; labor; planning; productivity; scheduling
Index terms: strategy, scheduling, time buffer, site layout, productivity, execution plan, owner, construction cost, planning process, case study, project management, labour productivity
Subjects: data collection methods, site logistics, financial and cost management, operations research, project management theory and practice, management, project controls, sociology
Topics: Cost Management, Business Strategy, Project Management, Research Practice, Stakeholder Management, Site Management, Time Control
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here