Effect of rock trenching vibrations on nearby structures

Atalah, A (2008) Effect of rock trenching vibrations on nearby structures. Journal of Construction Engineering and Management, 134(4), pp. 234-241. ISSN 0733-9364

Abstract

Trenching to install deep gravity sewers and drains in medium-to high-strength rock requires large and heavy rock trenchers that produce high levels of vibrations that may affect the structural integrity of nearby utilities and buildings. Although not every vibration causes damage, owners often believe that their structures have been harmed by rock excavation. The resulting disputes can waste a great deal of time and money. In an effort to reduce structural damage and associated disputes, this paper provides guidelines for the safe distance between rock trenchers and nearby buildings and underground structures. Vibration data at different distances from the trencher centerline were collected from five trenching projects in Northwest Ohio. The data analysis suggests a moderate relationship between the vibration level and the distance from the source of vibration. In addition, the risk of damage to nearby structures dissipates significantly and quickly as the distance from the point of excavation increases. Rock trenching should not take place closer than 1.50 m for buried structures and 1.00 m for residential buildings. Beyond this safe distance, damage to nearby structures should not take place.

Item Type: Article
Uncontrolled Keywords: ground motion; rocks; trenches; velocity; vibration
Index terms: vibration, excavation, data analysis, sewer, underground structure, utilities, dispute, integrity, owner, residential building
Subjects: data analysis and analytics, construction operations, dispute resolution, construction type, mechanical systems, infrastructure and transport systems, geotechnical engineering, sociology, health safety and environment
Topics: Site Management, Legal Issues, Stakeholder Management, Construction Technology, Health and Safety, Engineering Principles, Research Practice
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here