Cheung, S O; Yiu, T W; Leung, A Y T and Chiu, O K (2008) Catastrophic transitions of construction contracting behavior. Journal of Construction Engineering and Management, 134(12), pp. 942-952. ISSN 0733-9364
Abstract
The ways to manage a construction project very much depend on the attitude of the people involved. Collectively this is identified as construction contracting behavior (CCB). The CCB of the construction industry is adversarial as pinpointed in many industry-wide reviews. A more cooperative project delivery approach has therefore been advocated. In fact, drive for efficiency provides the incentive for cooperation. Nevertheless, members of a project team, in representing their respective organizations, are often in conflict. The dichotomous pair of cooperation and aggression forces therefore coexist. It is not uncommon to note that CCB turns aggressive as the construction activities of a project intensify. This change is often sudden and thus matches well with the phenomenon of hysteresis described by the catastrophe theory (CT). It is hypothesized that the dynamics of CCB can be modeled by CT. The three-variable CT models include CCB (as dependent variable), cooperation forces (as normal factor) and aggression forces (as splitting factor). With data collected from a survey fitted by the Cuspfit program, it was found that trust intensity is an effective normal factor. Contract incompleteness and competitive inertia are splitting factors that trigger aggression.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction management; contract management; contracts |
| Index terms: | dependent variable, cooperation, construction project, program, survey, contract management, project team, project delivery, construction industry, dynamics, catastrophe theory, construction activity, efficiency |
| Subjects: | construction operations, project delivery, psychology, data collection methods, mathematical modelling, industry analysis, systems engineering, statistical analysis, production management, contract management, software systems, performance management |
| Topics: | Procurement, Project Management, Research Practice, Engineering Principles, Site Management, Organizational Design, Contract Administration, Quality Management, Digital Applications |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here