Integrating construction process documentation into building information modeling

Goedert, J D and Meadati, P (2008) Integrating construction process documentation into building information modeling. Journal of Construction Engineering and Management, 134(7), pp. 509-516. ISSN 0733-9364

Abstract

The research described in this paper extends the use of building information modeling (BIM) throughout the construction phase of the project life cycle. The owner is a military base that uses three-dimensional (3D) modeling for underground services and the footprints of the buildings. They were interested in determining the feasibility of capturing the construction process and related documents into a similar format. The research was conducted in parallel with traditional methods. The objectives of this project were to create a 3D as-built model, a four-dimensional as-built model, and attach the construction process information to the model for the owner to use after construction. A literature review indicates that BIM application stops at the preconstruction phase with a limited amount of research regarding data collection of the construction process. Significant contributions include practical 3D data collection methods and extending the BIM software products to accommodate construction process documentation. Results indicate that BIM software is not specifically prepared to accomplish these objectives and some modification to procedures as well as software were necessary for the BIM to capture the construction process documentation.

Item Type: Article
Uncontrolled Keywords: construction management; data communication; documentation; information management; information retrieval; parameters; three-dimensional models
Index terms: construction process, as-built model, documents, literature review, documentation, modelling, construction phase, information retrieval, building information modelling, life cycle, owner
Subjects: project delivery, analytical methods, data analysis and analytics, technical documentation, value management, information systems, sociology, building construction, data management, professional development
Topics: Stakeholder Management, Engineering Principles, Information Management, Project Management, Research Practice, Site Management, Digital Applications, Design Practice
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here