Safety performance in the Egyptian construction industry

Hassanein, A A G and Hanna, R S (2008) Safety performance in the Egyptian construction industry. Journal of Construction Engineering and Management, 134(6), pp. 451-455. ISSN 0733-9364

Abstract

This study presents the results of a questionnaire survey that was conducted among a selected sample of large-size contractors operating in Egypt, as well as a comparison of the safety approaches in both the United States and Egypt. The results revealed that safety programs applied by large-size contractors in Egypt were less formal than those applied by their American counterparts. Only a few companies out of the surveyed sample had accident records broken down by projects and provided workers with formal safety orientation. Finally, the study recommended that reforms in the way of the employer's contribution to social insurance were necessary; thereby linking accident insurance costs to the contractor's safety performance. This is meant to serve as a strong incentive for safety management.

Item Type: Article
Uncontrolled Keywords: contractors; Egypt; safety
Index terms: Egypt, construction industry, safety orientation, insurance, safety programs, safety management, safety performance, questionnaire, survey, United States
Subjects: health safety and environment, Geography, occupational health and safety management, industry analysis, data collection methods, economic analysis
Topics: Health and Safety, Business Strategy, Research Practice, Geographical Context
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here