Leung, M Y; Chan, Y S; Chong, A and Sham, J F C (2008) Developing structural integrated stressor-stress models for clients' and contractors' cost engineers. Journal of Construction Engineering and Management, 134(8), pp. 635-643. ISSN 0733-9364
Abstract
Estimation is not a purely scientific task. It requires cost engineers equipped with a wide knowledge of construction and a professional ability to make judgments. However, stress will deaden their use of knowledge and influence their professional judgment in estimating. In the construction industry, cost engineers can generally be divided into two main groups: clients' cost engineers in consultant firms or in a development company who serve clients; and contractors' cost engineers in construction companies working for the contractors. This study investigates the causal relationships between the stressors and stress of clients' and contractors' cost engineers. Two stressor-stress integrated models were developed for these two cost engineer groups by using the structural equation model. The findings revealed some stressors that affected both clients' and contractors' cost engineers: (1) poor environment, role conflict and work underload affect their stress positively; (2) social support and Type A behavior affect their stress negatively; and (3) work underload induces stress via the role conflict among cost engineers, their supervisors, and the organization. On the other hand, some deviations between these two groups of cost engineers also occur: (1) social support acts as a source of stressors of clients' cost engineers; (2) a private life stressor only affects the stress of contractors' cost engineers; and (3) a closed interactive looping relationship among role conflict, Type A behavior, and work underload affects contractors' cost engineers. Based on the results of this study, some recommendations are suggested to manage cost engineers' stress well.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | client relationships; contractors; cost control |
| Index terms: | cost control, role conflict, estimating, stressors, construction company, structural equation model, construction industry, supervisor, integrated model, judgment, engineer, deviation, consultant firm, estimation |
| Subjects: | statistical analysis, industry analysis, health conditions and diseases, sociology, practitioner, dispute resolution, organization, profession, financial and cost management, analytical methods |
| Topics: | Organizational Design, Legal Issues, Roles and Professions, Research Practice, Information Management, Cost Management, Business Strategy, Health and Safety |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here