Optimizing construction time and cost using ant colony optimization approach

Ng, S T and Zhang, Y (2008) Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), pp. 721-728. ISSN 0733-9364

Abstract

Time and cost are the most important factors to be considered in every construction project. In order to maximize the return, both the client and contractor would strive to optimize the project duration and cost concurrently. Over the years, many research studies have been conducted to model the time-cost relationships, and the modeling techniques range from the heuristic methods and mathematical approaches to genetic algorithms. Despite that, previous studies often assumed the time being constant leaving the analyses based purely on a single objective-cost. Acknowledging the significance of time-cost optimization, an evolutionary-based optimization algorithm known as ant colony optimization is applied to solve the multiobjective time-cost optimization problems. In this paper, the basic mechanism of the proposed model is unveiled. Having developed a program in the Visual Basic platform, tests are conducted to compare the performance of the proposed model against other analytical methods previously used for time-cost modeling. The results show that the ant colony system approach is able to generate better solutions without utilizing much computational resources which provides a useful means to support planners and managers in making better time-cost decisions efficiently.

Item Type: Article
Uncontrolled Keywords: optimization; project management; time factors
Index terms: cost optimization, manager, genetic algorithm, optimization algorithm, construction project, program, ant colony optimization, heuristic, platform, modelling, duration, construction time, project management, planner
Subjects: project controls, decision-making and optimization, software systems, algorithms, economics, digital design, project management theory and practice, production management, analytical methods, risk assessment, profession, practitioner
Topics: Digital Applications, Time Control, Cost Management, Engineering Principles, Research Practice, Project Management, Risk Management, Roles and Professions
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here