Single versus multiple prime contracting

Rojas, E M (2008) Single versus multiple prime contracting. Journal of Construction Engineering and Management, 134(10), pp. 758-765. ISSN 0733-9364

Abstract

Policies regarding public building construction affect the interests of taxpayers, construction authorities, general contractors, specialty contractors, and other stakeholders. At the state level, the debate as to the optimal form such policies should take has become an ongoing struggle among competing interests. This study presents a systematic analysis of the main issues regarding single versus multiple prime contracting with the purpose of providing objective data to illuminate the debate. A statistical analysis of project bids and final costs from a national sample of state construction projects reveals that public construction projects organized with multiple prime contracts tend to have 5% less direct costs than projects using a single prime contractor. Moreover, approximately 80% of these savings are attributable to lower bid costs for multiple prime projects. The results of this study are in agreement with theoretical bidding models and efficient risk allocation models. Theoretical bidding models suggest that, in the absence of disruptions, multiple prime projects should have lower direct costs than single prime jobs. Efficient cost allocation models suggest that when specialty contractors do not bear the risks associated with the single prime contracting method (e.g., bid shopping and payment delays) they are willing to lower their bids, and forego the premium they would normally charge in response to such risks, as seems to be the case in multiple prime jobs.

Item Type: Article
Uncontrolled Keywords: construction costs; contracts; cost estimates; public policy
Index terms: contracting method, risk allocation, public building construction, construction cost, public policy, specialty contractor, savings, construction project, statistical analysis, public construction, direct cost, bidding, general contractor, cost estimate
Subjects: public policy, practitioner, economics, professional practice, data science, bidding, financial and cost management, contractual arrangements, building construction, economic analysis, financial risk, production management
Topics: Project Management, Roles and Professions, Research Practice, Engineering Principles, Procurement, Cost Management, Governance, Design Practice, Business Strategy
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here