Slip-form application to concrete structures

Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364

Abstract

Because of superior speed and productivity, slip forms were extensively utilized as a potential formwork candidate in constructing concrete structures for the past few decades. Typical projects that employ this formwork technique are: Core of high-rise buildings, silos, telecommunication towers, cooling towers, heavy concrete offshore platforms, etc. The research presented in this paper aims at studying slip-form application to cores and silos, assessing its productivity, and determining its appropriate speed as well as auxiliary resource combinations. Simulation models are developed in which the potential control units in a slip-form system are described for cores and silos. Data are collected from several case study projects. A set of charts has been developed to predict productivity considering different stoppages, core cross section area, slipping (jacking) rate, and concrete placing methods. These charts play an essential role in managing slip-form application to cores and silos. Results show that the developed simulation models predict the productivity of case study projects with 99.70 and 99.30% accuracy for cores and silos, respectively. The presented research is relevant to both researchers and practitioners. It provides practitioners with charts that assist in scheduling and managing the required resources for slip-form application. In addition, it provides researchers with simulation models and framework for implementing slip forms to core and silo construction.

Item Type: Article
Uncontrolled Keywords: concrete structures; productivity; simulation models
Index terms: placing, formwork, practitioner, telecommunication, high-rise building, concrete structure, scheduling, case study, accuracy, silo construction, productivity, platform
Subjects: concrete and cementitious materials, structural engineering, communication, data collection methods, construction type, practitioner, infrastructure and transport systems, management, digital design, operations research, building construction, professional development
Topics: Engineering Principles, Research Practice, Roles and Professions, Digital Applications, Business Strategy, Information Management, Time Control, Construction Technology, Construction Materials
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here