Developing a decision support tool for nighttime construction in highway projects

Al-Kaisy, A and Nassar, K (2009) Developing a decision support tool for nighttime construction in highway projects. Journal of Construction Engineering and Management, 135(2), pp. 119-125. ISSN 0733-9364

Abstract

This paper presents a decision support tool that is intended to help highway agencies in evaluating the suitability of nighttime construction for highway projects. This tool was developed as part of a research project sponsored by the Illinois Department of Transportation. The tool is a simple software package that was developed using a Microsoft Excel spreadsheet and Visual Basic for Applications. The proposed tool utilizes the cost-effectiveness analysis as a basis for comparison between daytime and nighttime operations. The proposed tool is mainly used whenever night shift is thought of as an alternative to the conventional daytime shift. Nonetheless, the tool is also generic in the sense that it can be used to compare different alternative plans such as different lane closure strategies or scheduling alternatives.

Item Type: Article
Uncontrolled Keywords: construction cost; economic factors; highways and roads; maintenance; nighttime construction; traffic delay
Index terms: scheduling, spreadsheet, strategy, suitability, cost-effectivenes, agency, economic factor, software package, highway construction, decision support, construction cost
Subjects: civil engineering, management, economics, economic concepts, data science, software systems, sociology, design criteria, decision analysis, financial and cost management, operations research
Topics: Risk Management, Design Practice, Engineering Principles, Research Practice, Time Control, Business Strategy, Cost Management
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here