Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364
Abstract
The S-curve is a graphical representation of a construction project's cumulative progress from start to finish. While S-curves for project control during construction should be estimated analytically based on a schedule of activity times, empirical estimation methods using various mathematical S-curve formulas have been developed for initial planning at predesign stages, with the mean for past similar projects often used as the basis of prediction. In an attempt to make an improvement, a succinct cubic polynomial function for generalizing S-curves is proposed and a comparison with existing formulas shows its advantages of accuracy and simplicity. Based on an analysis of the attributes and actual progress of 101 projects, four factors, i.e., contract amount, duration, type of work, and location, are then used as the inputs of a model developed for estimating S-curves as represented by the polynomial parameters. For model development, it is proposed to use neural networks for their ability to perform complex nonlinear mapping. The neural network model is compared with statistical models with respect to modeling and testing accuracy. The results show that the presented methodology can achieve error reduction consistently, thereby being potentially useful for owners and contractors in early financial planning and checking schedule-based estimates.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction management; curve fitting; estimates; neural networks; polynomials |
| Index terms: | estimation, owner, s-curve, graphical representation, project control, testing, duration, modelling, estimate, statistical model, financial planning, accuracy, neural network, methodology, mapping, construction project, estimating, model development |
| Subjects: | visualization, professional practice, data science, artificial intelligence, analytical methods, financial and cost management, control systems, project controls, sociology, research methods, spatial and geospatial analysis, economics, production management, professional development |
| Topics: | Digital Applications, Time Control, Cost Management, Research Practice, Project Management, Information Management, Engineering Principles, Stakeholder Management |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here