Lam, P T I; Kumaraswamy, M M and Ng, T S T (2003) A comparative study of user perceptions on prescriptive specifications versus performance-based specifications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Abstract
Nearly every construction project has its specifications written in either the prescriptive format or the performance-based format, or a mixture of both. The recent proliferation of specialist works and the popularity of the Design and Build procurement method have given rise to an increased use of performance specifications. Whilst prescriptive specifications are characterised by detailed descriptions of material and workmanship requirements, performance specifications lay down the desired end results and verification methods. It is often said that the latter allows flexibility and encourages innovations in the use of materials, systems and methods. Yet, performance specifications are not without their problems. Commonly cited complaints raise questions on the practicality of some targets, as well as the lack of objective criteria for testing certain results. Substantiating the achievement of desired results becomes problematic for many contractors. A recent survey carried out in both Hong Kong and Singapore explored the perceptions of users on both types of specifications. Clients, consultants and contractors have given their ratings and opinions on the attributes, usefulness and limitations of performance specifications. The types of work currently being specified by performance in the two cities were also surveyed. Some interesting comparisons on the use of prescriptive and performance specifications have been made between the two cities and they are correlated with the respective contextual backgrounds, which are largely similar yet with distinguishable features.
| Item Type: | Conference Paper (Paper) |
|---|---|
| Uncontrolled Keywords: | prescriptive specifications; performance-based specifications; Hong Kong; Singapore |
| Index terms: | specification, Singapore, Hong Kong, prescriptive specification, performance-based specification, procurement method, survey, complaint, performance specification, construction project, comparative study, workmanship, performance-based, design and build, testing |
| Subjects: | data collection methods, research design and methodology, professional practice, contractual arrangements, performance measurement, tendering, production management, contractual condition, Geography, conflict resolution |
| Topics: | Procurement, Stakeholder Management, Engineering Principles, Project Management, Geographical Context, Research Practice, Contract Administration, Quality Management |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here