Hallowell, M R and Gambatese, J A (2009) Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management, 135(10), pp. 990-998. ISSN 0733-9364
Abstract
Most of safety risk research focuses on high-severity safety risks for large-scale construction processes. Such studies help firms identify the highest risk processes so they may be targeted for improvement. However, few studies quantify safety risk at the activity level or include low-severity, high-frequency risks that some literatures suggest contribute to a large proportion of total risk. This paper presents research that involved the holistic quantification of risks for the activities associated with the construction of concrete formwork. Three major research efforts are discussed: (1) identification of activities required to construct concrete formwork; (2) selection of an appropriate all-inclusive and mutually exclusive risk classification system; and (3) the quantification of the average frequency and severity levels for each risk classification associated with each activity. To identify formwork construction activities, 256 worker-hours of observation were conducted and the resulting activity descriptions were reviewed and validated by industry professionals. Risk classifications appropriate for this study were created by aggregating relevant literature. Finally, the Delphi method was implemented to individually quantify average frequency and severity using scales that define the entire spectrum of possible values. In total, 130 frequency ratings and 130 severity ratings were obtained over three rounds of Delphi surveys. Results indicate that there are 13 major activities required to construct concrete formwork and the highest risk activities are applying form oil, lifting and lowering form components, and accepting materials from a crane. The data presented in this paper can be used to target specific high-risk formwork construction activities for improvement.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | concrete construction; occupational health; risk management; safety |
| Index terms: | Delphi method, risk management, concrete construction, lifting, construction activity, Delphi survey, quantification, formwork, concrete formwork, occupational health, construction process |
| Subjects: | construction methods, building construction, measurement and scaling, occupational health and safety management, data collection methods, risk assessment, construction operations |
| Topics: | Site Management, Research Practice, Engineering Principles, Risk Management, Construction Technology, Health and Safety |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here