Cost-benefit analysis of embedded sensor system for construction materials tracking

Jang, W S and Skibniewski, M J (2009) Cost-benefit analysis of embedded sensor system for construction materials tracking. Journal of Construction Engineering and Management, 135(5), pp. 378-386. ISSN 0733-9364

Abstract

Tracking and monitoring the location of materials on a construction job site is an important, yet commonly overlooked aspect of field data acquisition because timely information about the status of materials, equipment, tools, and labor resources are directly related to the successful completion of a project. With the advanced technologies and innovations in the construction industry, it has become technically viable to implement automated tracking for construction materials. Through the development of an embedded sensor system, this paper illustrates the implementation of pilot experiments examining the accuracy of a system's performance. A cost-benefit analysis is conducted to illustrate labor savings associated with construction materials handling by comparison between manual and sensor-based materials tracking. The presented embedded sensor system can be extended into diverse application areas in tracking and monitoring framework by providing improved method of field data acquisition and information management.

Item Type: Article
Uncontrolled Keywords: benefit cost ratios; construction materials; positioning; sensors; tracking
Index terms: savings, data acquisition, labour resource, implementation, construction industry, construction material, monitoring, accuracy, experiment
Subjects: business economics, industry analysis, professional development, building materials, contractual arrangements, economic analysis, data collection methods, control systems
Topics: Business Strategy, Information Management, Engineering Principles, Research Practice, Procurement, Site Management
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here