Integrated model for the stressors and stresses of construction project managers in Hong Kong

Leung, M Y; Chan, Y S and Yu, J (2009) Integrated model for the stressors and stresses of construction project managers in Hong Kong. Journal of Construction Engineering and Management, 135(2), pp. 126-134. ISSN 0733-9364

Abstract

Construction projects involve multistakeholders (e.g., architects, structural engineers, surveyors, contractors, suppliers, etc.) completing a large number of unpredictable tasks in a complex process within a limited period of time. Construction project managers (C-PMs) are the key persons in achieving project success throughout the construction process, as they are responsible for planning the construction program, organizing human resources, controlling operations and the budget, and forecasting probable difficulties. Hence, C-PMs always encounter a great deal of stress in construction projects. Apart from the subjective feelings experienced by individual C-PMs, C-PMs may also feel objective stress due to the deviation between their actual abilities and their expected abilities on tasks or projects. To understand the integrated relationships between the various stressors and stresses of C-PMs, a survey was conducted of 108 C-PMs in Hong Kong. This paper attempts to investigate the causal relationships between stressors and stresses (both subjective and objective). The study reveals seven stressors of C-PMs in the industry. Based on the results of a correlation coefficient, an optimized stressor-stress structural equation model is established. Four critical stressors were found to have significant impact on both the subjective and the objective stresses of C-PMs, including work overload, poor interpersonal relationships, poor work environment, and poor nonwork environment. A number of recommendations were made for both construction companies and individual C-PMs in their offices and at home in order to optimize their work performance in the real world.

Item Type: Article
Uncontrolled Keywords: construction management; Hong Kong; integrated systems; stress
Index terms: construction project, survey, stressors, work performance, program, construction company, construction process, architect, human resource, interpersonal relationship, integrated model, work environment, forecasting, structural equation model, Hong Kong, integrated system, deviation, structural engineer, manager, project success
Subjects: Geography, data collection methods, practitioner, prediction and forecasting, management, software systems, organization, analytical methods, behavioral psychology, financial and cost management, operations management, statistical analysis, building construction, production management, project management theory and practice, health conditions and diseases, profession, design methods
Topics: Information Management, Project Management, Health and Safety, Geographical Context, Cost Management, Roles and Professions, Digital Applications, Design Practice, Research Practice, Human Resources, Organizational Design, Business Strategy, Site Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here