AHP-based weighting of factors affecting safety on construction sites with tower cranes

Shapira, A and Simcha, M (2009) AHP-based weighting of factors affecting safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 135(4), pp. 307-318. ISSN 0733-9364

Abstract

Aspiring to adopt a nonstatistical quantitative approach to safety assessment, this study implements a multiattribute decision-making tool to elicit knowledge from experts and formalize it into a set of weighted safety factors. The environment addressed is the construction site and the specific factors studied are those affecting safety due to the operation of tower cranes. Nineteen senior construction equipment and safety experts were interviewed and led through the analytic hierarchy process (AHP) to provide their assessments on the relative importance of safety factors obtained in an earlier study. The results accentuate the dominance of the crane operator and general superintendent on the site safety scene and play down the contribution of "classic" site hazards such as power lines. Quantitative measuring of safety, such as reflected in the weights obtained in this study, is important in communicating safety requirements and focusing the limited resources available for safety improvements. These factor weights are also deemed to be a vital component in the development of a comprehensive model that will allow the computation of safety indices for individual construction sites employing tower cranes. It is expected that the methodology can then be adopted for addressing other site safety issues as well.

Item Type: Article
Uncontrolled Keywords: construction sites; cranes; hazards; quantitative analysis; safety
Index terms: quantitative analysis, safety factor, methodology, decision-making, computation, safety issue, construction site, relative importance, crane operator, tower crane, construction equipment
Subjects: decision analysis, financial risk, construction equipment, research methods, maintenance engineering, data analysis and analytics, work location, practitioner, risk assessment, computational methods
Topics: Plant and Equipment, Roles and Professions, Risk Management, Research Practice, Cost Management, Business Strategy, Site Management, Digital Applications
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here