Case study of the dallas independent school district’s construction value

Parmar, D; Kashiwagi, D and Savicky, J (2003) Case study of the dallas independent school district’s construction value. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Abstract

The objective of this research is to show that proper outsourcing may result in an increase of roofing system performance (on time, on budget, and meeting the user’s quality expectations). The Dallas Independent School District is attempting to increase roofing construction performance by using a best-value system called the Performance Information Procurement System. The District had the following sub-objectives: 1) increase competition, 2) increase the level of service of contractors/manufacturers, 3) minimize management and inspection requirements, 4) increase the quality and performance of roofing construction, 5) increase the warranty period and improve the response to warranty issues, and 6) increase the overall value of roofing construction by offering longer service periods with lower maintenance costs. The PIPS roofing tests met all of the DISD objectives.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: best value; outsourcing; performance-based procurement
Index terms: construction performance, inspection, manufacturer, case study, outsourcing, performance-based procurement, maintenance cost, level of service, school district, warranty, best value, roofing, procurement system, competition
Subjects: design practice, financial management, performance measurement, market analysis, quality assurance, data collection methods, business, practitioner, performance assessment, bidding, educational management, contractual arrangements
Topics: Procurement, Roles and Professions, Research Practice, Business Strategy, Education, Site Management, Quality Management, Design Practice
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here