Ashuri, B and Lu, J (2010) Time series analysis of ENR construction cost index. Journal of Construction Engineering and Management, 136(11), pp. 1227-1237. ISSN 0733-9364
Abstract
Every month, Engineering News-Record (ENR) publishes the construction cost index (CCI), which is a weighted aggregate index of the 20-city average prices of construction activities. Although CCI increases over the long term, it is subject to considerable short-term variations, which make it problematic for cost estimators to prepare accurate bids for contractors or engineering estimates for owner organizations. The ability to predict construction cost trends can result in more-accurate bids and avoid under- or overestimation. This paper summarizes and compares the applicability and predictability of various univariate time series approach for in-sample and out-of-sample forecastings of CCI. It is shown that the seasonal autoregressive integrated moving-average model is the most-accurate time series approach for in-sample forecasting of CCI, while the Holt-Winters exponential smoothing model is the most-accurate time series approach for out-of-sample forecasting of CCI. It is also shown that several time series models provide more-accurate out-of-sample forecasts than the ENR's subject matter experts' CCI forecast. Cost estimators can benefit from CCI forecasting by incorporating predicted price variations in their estimates and preparing more-accurate bids for contractors and budgets for owners. Owners and contractors can use CCI forecasting in reducing construction costs by better-timed project execution.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | autoregressive integrated moving average; autoregressive models; autoregressive moving-average models; construction costs; seasonal arima; time series analysis |
| Index terms: | winter, time series, construction cost index, variation, smoothing, construction cost, aggregate, construction activity, owner, forecasting, time-series analysis, cost estimator, estimate |
| Subjects: | contractual condition, sociology, research evaluation and metrics, climate science, materials science, profession, prediction and forecasting, financial and cost management, construction operations, data science, cost indicators |
| Topics: | Design Practice, Site Management, Contract Administration, Cost Management, Research Practice, Engineering Principles, Stakeholder Management, Roles and Professions, Sustainability |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here