Cheung, S O; Yiu, T W and Chan, H W (2010) Exploring the potential for predicting project dispute resolution satisfaction using logistic regression. Journal of Construction Engineering and Management, 136(5), pp. 508-517. ISSN 0733-9364
Abstract
The success of a construction project depends on the coordinated efforts of project team members. This is especially crucial when a project is in dispute and hence the achievement of satisfactory project dispute resolution is critical to project success. This proposition has been empirically demonstrated a previous research that studied project dispute resolution satisfaction (DRS) using multivariate discriminant analysis (MDA). This paper reports on a study that builds on that research, with the specific aim of predicting project DRS through the use of logistic regression (LR). In this study, a LR model of project DRS (Model 1) is developed, and then compared with the MDA model. The findings suggest that the LR technique provides a higher hit rate and thus a higher proportion of correct classification. With the wider acceptance of the use of alternative dispute resolution (ADR) methods, the effect, on the LR model, of changing the demarcation between adverse and favorable project DRS is also examined. For this examination, another LR model (Model 2) was developed. It is believed that Model 2 may reflect the prevailing sentiment that ADR is viewed as an amicable way to resolve disputes. Both the MDA model and LR models (Model 1 and Model 2) indicated that "design changes" are the root cause of adverse project DRS. Within the scope of the project data, these findings suggest that design changes are not just disruptive to project progress but also a critical cause of construction disputes.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction dispute resolution; dispute resolution; dispute resolution satisfaction; logistic regression; logistics; multivariate discriminant analysis; project management |
| Index terms: | design change, project data, alternative dispute resolution, construction project, dispute, discriminant analysis, project success, logistic regression, satisfaction, resolution, construction dispute, project management, project team |
| Subjects: | contract management, project management theory and practice, production management, conflict resolution, statistical analysis, data collection methods, dispute resolution, project delivery, contractual arrangements |
| Topics: | Contract Administration, Legal Issues, Procurement, Stakeholder Management, Research Practice, Project Management |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here