Evaluation of risk factors leading to cost overrun in delivery of highway construction projects

Creedy, G D; Skitmore, M and Wong, J K W (2010) Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), pp. 528-537. ISSN 0733-9364

Abstract

Accurate owner budget estimates are critical to the initial decision-to-build process for highway construction projects. However, transportation projects have historically experienced significant construction cost overruns from the time the decision to build has been taken by the owner. This paper addresses the problem of why highway projects overrun their predicted costs. It identifies the owner risk variables that contribute to significant cost overrun and then uses factor analysis, expert elicitation, and the nominal group technique to establish groups of importance ranked owner risks. Stepwise multivariate regression analysis is also used to investigate any correlation of the percentage of cost overrun with risks, together with attributes such as highway project type, indexed cost, geographic location, and project delivery method. The research results indicate a correlation between the reciprocal of project budget size and percentage cost overrun. This can be useful for owners in determining more realistic decision-to-build highway budget estimates by taking into account the economies of scale associated with larger projects.

Item Type: Article
Uncontrolled Keywords: construction management; cost estimates; cost overrun; costs; highway construction; highways and roads; project delivery; risk management
Index terms: overrun, transportation project, project delivery, regression analysis, cost estimate, estimate, risk factor, factor analysis, risk management, highway construction, owner, construction cost, cost overrun
Subjects: financial and cost management, project delivery, risk assessment, project controls, sociology, infrastructure and transport systems, statistical analysis, environmental hazards, civil engineering
Topics: Cost Management, Research Practice, Engineering Principles, Stakeholder Management, Risk Management, Procurement, Sustainability, Time Control
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here