Modeling microtunneling projects using computer simulation

Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364

Abstract

Tunnels projects are constructed to facilitate the execution of underground works with minor disturbance on surface structures and traffic. This is deemed important especially in downtown cities where disturbances should be minimized to assure flowability on surface and underground infrastructures. Microtunneling involves the use of a remotely controlled, guided pipe-jacking process in order to support excavation face. Microtunneling aids in avoiding the need of open trench for pipe laying, which causes extreme disruption to the surrounding. This paper presents a tool for planning microtunnels projects using computer simulation. The proposed tool aids contractors in planning microtunneling by estimating their associated time and cost of construction. There are six models that are coded in the proposed tool in order to capture the construction of microtunnels and shafts. The tool breaks down microtunnels projects into microtunnels segments and shafts which constitute several construction zones. An application example is presented to demonstrate the features of the proposed tool.

Item Type: Article
Uncontrolled Keywords: computer simulation; cost and scheduling; microtunneling; planning
Index terms: underground infrastructure, modelling, tunnel, scheduling, computer simulation, face, microtunneling, excavation, estimating
Subjects: infrastructure and transport systems, geotechnical engineering, financial and cost management, analytical methods, construction operations, modelling and simulation, operations research, psychology
Topics: Cost Management, Engineering Principles, Organizational Design, Site Management, Time Control, Digital Applications
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here